Dwyer CPS Uživatelský manuál Strana 3

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 4
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 2
WIRE CUP
CABLE
MOUNTING
BASE
FRAME OF BELT
CONVEYOR
8.25˝
4.5˝
Installation
Eye bolts should be prepared before installation, and should be
spaced according to the cable length (Figure 2). A single pull
cord up to 50 feet should have an eye bolt mounted every 10
feet. When using a single pull cord up to 75 feet there should be
an eyebolt every 3 feet. The maximum length of cable between
CPS is 75 feet (Note: Variations in temperature will cause cable
to expand and contract). The ideal cord is a steel cable 0.25
inches in diameter. Figure 3 is a typical installation of a CPS.
CONVEYOR BELT FRAME
EYE BOLTS
CABLE
Fig. 2 Installation of Eye Bolts
Fig. 3 Typical Installation of CPS
PC-CPS-1:TEMPLATE 7/10/09 10:11 AM Page 3
Zobrazit stránku 2
1 2 3 4

Komentáře k této Příručce

Žádné komentáře